AXE 机械 Logo
AXE 机械 Logo
机械//经销商
ARJESIMPAKTOR
01首页
02产品

// 紧凑型

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// 标准型

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// 重型

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// 超重型

[ 01 ]1250 D//[ 02 ]1250 E//

// 机械档案

[ 00 ]全部机型//[ 99 ]PDF 库//
激活
03解决方案
04技术
05合规
请求
AZ // 合规🇦🇿 ACTIVE

阿塞拜疆ARJES Impaktor 350 EVO II

监管指令

“Azerbaijan's waste management framework is governed by the Law 'On Waste' (№ 442-IGQ) and the Law on Industrial and Domestic Waste. The legislation establishes state policy for waste prevention, collection, transportation, and disposal. C&D waste management is increasingly important due to large-scale reconstruction in liberated territories (Aghdam, Fuzuli). Gate fees remain relatively low at €10/t for mixed C&D waste, but are rising as the country modernizes its waste infrastructure. The EU4Environment programme is supporting regulatory improvements. Administrative fines apply for non-compliance, with criminal liability for serious environmental damage. The reconstruction effort creates significant demand for mobile C&D processing equipment.”

原始法案:Tullantılar haqqında Azərbaycan Respublikasının Qanunu (№ 442-IGQ) və Sənaye və məişət tullantıları haqqında QanunLaw of the Republic of Azerbaijan "On Waste" (№ 442-IGQ) & Law on Industrial and Domestic Waste
来源: 监管数据图谱需要复核
ARJES Impaktor 350 EVO II — recommended shredder for 阿塞拜疆
功率
175 kW
驱动方式
diesel
排放
Stage V
标价
€170K
垃圾填埋费
10EUR/t
混合 C&D 废料 · 3 EUR/t 洁净分率
年度节省
€320K
€320,000,处理量 40,000 t/年,分流率 80%
年度运营支出
€67K
€67,305 · 能源 + AdBlue + 维护 · 2,000 h/年
能源 / 年
€41,800
AdBlue / 年
€1,505
维护 / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

40,000t/yr
5,000 吨80,000 吨

填埋费预设: 10 EUR/t · 分流率: 80%

年度节省
€320,000
10 EUR/t × 40,000 t × 80% 分流率
阿塞拜疆 适用的 ARJES Impaktor 350 EVO II
粘性节省€320,000
SEC_02_LEGAL_BASIS

Azerbaijan's waste management framework is governed by the Law 'On Waste' (№ 442-IGQ) and the Law on Industrial and Domestic Waste. The legislation establishes state policy for waste prevention, collection, transportation, and disposal. C&D waste management is increasingly important due to large-scale reconstruction in liberated territories (Aghdam, Fuzuli). Gate fees remain relatively low at €10/t for mixed C&D waste, but are rising as the country modernizes its waste infrastructure. The EU4Environment programme is supporting regulatory improvements. Administrative fines apply for non-compliance, with criminal liability for serious environmental damage. The reconstruction effort creates significant demand for mobile C&D processing equipment.

原始法案:Tullantılar haqqında Azərbaycan Respublikasının Qanunu (№ 442-IGQ) və Sənaye və məişət tullantıları haqqında QanunLaw of the Republic of Azerbaijan "On Waste" (№ 442-IGQ) & Law on Industrial and Domestic Waste
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
机制:vat exemptioncit deduction
✓ 增值税豁免✓ 30% 加速折旧
驱动:diesel排放:Stage V燃油:22 L/h
返回合规中心
AXE MACHINERY
合规报告
07 Sept 2026
阿塞拜疆
ACTIVE

1. 监管依据

原始法案: Tullantılar haqqında Azərbaycan Respublikasının Qanunu (№ 442-IGQ) və Sənaye və məişət tullantıları haqqında Qanun
1. 监管依据: Azerbaijan's waste management framework is governed by the Law 'On Waste' (№ 442-IGQ) and the Law on Industrial and Domestic Waste. The legislation establishes state policy for waste prevention, collection, transportation, and disposal. C&D waste management is increasingly important due to large-scale reconstruction in liberated territories (Aghdam, Fuzuli). Gate fees remain relatively low at €10/t for mixed C&D waste, but are rising as the country modernizes its waste infrastructure. The EU4Environment programme is supporting regulatory improvements. Administrative fines apply for non-compliance, with criminal liability for serious environmental damage. The reconstruction effort creates significant demand for mobile C&D processing equipment.
监管法案: Law of the Republic of Azerbaijan "On Waste" (№ 442-IGQ) & Law on Industrial and Domestic Waste

2. 经济影响分析

参数数值
区域阿塞拜疆
垃圾填埋费10 EUR/t
处理量40,000 t/yr
分流率80%
推荐系统ARJES Impaktor 350 EVO II
驱动类型DIESEL
排放标准Stage V
节省标签
€320,000
处理量 40,000 t/年,填埋分流率 80%
运营支出组件运营支出成本
柴油€41,800(incl. AdBlue €1,505)
维护€24,000
总计€67,305
AXE Machinery d.o.o. — 合规报告arjes-impaktor.rs

// 信息中心

研发与工程合规中心新闻物流与遗产设备

按物料分类的工业解决方案 // 运营中心

混凝土破碎木材回收废钢处理城市固体废物建筑拆除OTR 轮胎回收ELV 回收所有解决方案 →

// 对比矩阵

自营 vs 外包移动式 vs 固定式柴油 vs 电动TEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000所有对比 →

// 联系我们

+381644422555
info@arjes-impaktor.rs
BC Usce,1 号塔Bulevar Mihajla Pupina 611070 贝尔格莱德,塞尔维亚UTC+144.8125 N, 20.4612 E
AXE 机械 Logo
ARJESIMPAKTOR
法律隐私政策使用条款
© 2026 AXE Machinery. 保留所有权利